Solar plant: site data
Solar power plant in Oleksandrohrad, Volnovaskyi Raion, Donetsk Oblast
Oleksandrohrad: 1,171 kWh per kWp a year, tilt 36° 1° east of south (PVGIS). 0.8% above the oblast median (1,161). #139 of 161 in the rayon, #385 of 1312 in the oblast.
Volnovakha, the rayon centre, is 78 km away. 136 m above sea level. 43 km away: Hulyaypole, the nearest bigger centre, 1,193 — 1.8% less here. Snow and wind from the nearest regional centre in the DBN — Запоріжжя, 110 km. 10.19 m between rows, pitch 14.06 m (latitude 48.0°).
- Yield of 1 kWp
- 1,171kWh/year
- Tilt
- 36°1° east of south
- 10 kW
- 11,708kWh/year
- Row pitch
- 14.06m · GCR 0.34
- T_min
- -42 °Cregion II, south-eastern
- Snow S₀ / wind W₀
- 1,110 / 460Pa
Ground frame designer
A ground frame for a solar plant: Oleksandrohrad
The designer opens with this place’s coordinates, latitude 48.0° for the row spacing and the DBN loads of the nearest regional centre — Запоріжжя, 110 km: snow 1,110 Pa, wind 460 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
August: 151 kWh/kWp, December: 28 — 5.4 times less.
January: 35 against 37 in the oblast, 5.4% less.
| kWp | A year | August | December |
|---|---|---|---|
| 5 | 5,854 | 755 | 140 |
| 10 | 11,708 | 1,510 | 280 |
| 15 | 17,562 | 2,265 | 420 |
Example: a 10 kW ground frame
For the loads of Zaporizhzhia: 11.16 kWp, 18 panels, 382 kg of steel, 14 piles, materials ≈ 50,687 UAH.
How these numbers are computed
Nearby
- Sichneve4 km1,170 kWh/kWp
- Voskresenka4 km1,171 kWh/kWp
- Lisne5 km1,170 kWh/kWp
- Novoselivka6 km1,170 kWh/kWp
- Maliivka6 km1,172 kWh/kWp
- Vorone7 km1,172 kWh/kWp
All places: Volnovaskyi RaionDonetsk Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.