Solar plant: site data
Solar power plant in Svitlohirske, Kamianskyi Raion, Dnipropetrovsk Oblast
Svitlohirske: 1,182 kWh per kWp a year, tilt 36° 2° east of south (PVGIS). Exactly the oblast median (1,177). #36 of 280 in the rayon, #507 of 1501 in the oblast.
Kamyanske, the rayon centre, is 20 km away. 83 m above sea level. 20 km away: Kamyanske, the nearest bigger centre, the same 1,184. Snow and wind from the nearest regional centre in the DBN — Дніпро, 43 km. 10.46 m between rows, pitch 14.33 m (latitude 48.4°).
- Yield of 1 kWp
- 1,182kWh/year
- Tilt
- 36°2° east of south
- 10 kW
- 11,817kWh/year
- Row pitch
- 14.33m · GCR 0.33
- T_min
- -42 °Cregion II, south-eastern
- Snow S₀ / wind W₀
- 1,340 / 470Pa
Ground frame designer
A ground frame for a solar plant: Svitlohirske
The designer opens with this place’s coordinates, latitude 48.4° for the row spacing and the DBN loads of the nearest regional centre — Дніпро, 43 km: snow 1,340 Pa, wind 470 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 151 kWh/kWp, December: 29 — 5.2 times less.
December: 29 against 28 in the oblast, 3.6% more.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 5,909 | 755 | 145 |
| 10 | 11,817 | 1,510 | 290 |
| 15 | 17,726 | 2,265 | 435 |
Example: a 10 kW ground frame
For the loads of Dnipro: 11.16 kWp, 18 panels, 346 kg of steel, 12 piles, materials ≈ 51,820 UAH.
How these numbers are computed
Nearby
- Slobidske2 km1,182 kWh/kWp
- Krynychky3 km1,183 kWh/kWp
- Hrymuche4 km1,182 kWh/kWp
- Cherneche5 km1,183 kWh/kWp
- Chervonyi Yar5 km1,186 kWh/kWp
- Olenivka6 km1,183 kWh/kWp
All places: Kamianskyi RaionDnipropetrovsk Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.