Solar plant: site data

Solar power plant in Shyroke, Synelnykivskyi Raion, Dnipropetrovsk Oblast

Shyroke: 1,180 kWh per kWp a year, tilt 36° facing south (PVGIS). Exactly the oblast median (1,177). #64 of 370 in the rayon, #593 of 1501 in the oblast.

Synelnykove, the rayon centre, is 33 km away. 140 m above sea level. 18 km away: Novomykolayivka, the nearest bigger centre, 1,188 — 0.7% less here. Snow and wind from the nearest regional centre in the DBN — Запоріжжя, 63 km. 10.30 m between rows, pitch 14.17 m (latitude 48.1°).

Yield of 1 kWp
1,180kWh/year
Tilt
36°facing south
10 kW
11,795kWh/year
Row pitch
14.17m · GCR 0.34
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
1,110 / 460Pa

Ground frame designer

A ground frame for a solar plant: Shyroke

The designer opens with this place’s coordinates, latitude 48.1° for the row spacing and the DBN loads of the nearest regional centre — Запоріжжя, 63 km: snow 1,110 Pa, wind 460 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

34Jan52Feb95Mar118Apr140May144Jun152Jul151Aug124Sep93Oct49Nov29Dec

July: 152 kWh/kWp, December: 29 — 5.2 times less.

November: 49 against 47 in the oblast, 4.3% more.

Shyroke: plants, kWh
kWpA yearJulyDecember
55,898760145
1011,7951,520290
1517,6932,280435

Snow and wind: Запоріжжя

Example: a 10 kW ground frame

For the loads of Zaporizhzhia: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 49,705 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Synelnykivskyi RaionDnipropetrovsk Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.