Solar plant: site data

Solar power plant in Shevske, Samarivskyi Raion, Dnipropetrovsk Oblast

Shevske: 1,155 kWh per kWp a year, tilt 36° 2° east of south (PVGIS). 1.9% below the oblast median (1,177). #101 of 115 in the rayon, #1474 of 1501 in the oblast.

Samar, the rayon centre, is 48 km away. 112 m above sea level. 32 km away: Tsarychanka, the nearest bigger centre, 1,170 — 1.3% less here. Snow and wind from the nearest regional centre in the DBN — Дніпро, 60 km. 10.95 m between rows, pitch 14.82 m (latitude 49.0°).

Yield of 1 kWp
1,155kWh/year
Tilt
36°2° east of south
10 kW
11,551kWh/year
Row pitch
14.82m · GCR 0.32
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
1,340 / 470Pa

Ground frame designer

A ground frame for a solar plant: Shevske

The designer opens with this place’s coordinates, latitude 49.0° for the row spacing and the DBN loads of the nearest regional centre — Дніпро, 60 km: snow 1,340 Pa, wind 470 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

34Jan52Feb92Mar116Apr138May143Jun151Jul150Aug121Sep88Oct43Nov27Dec

July: 151 kWh/kWp, December: 27 — 5.6 times less.

November: 43 against 47 in the oblast, 8.5% less.

Shevske: plants, kWh
kWpA yearJulyDecember
55,776755135
1011,5511,510270
1517,3272,265405

Snow and wind: Дніпро

Example: a 10 kW ground frame

For the loads of Dnipro: 11.16 kWp, 18 panels, 346 kg of steel, 12 piles, materials ≈ 51,820 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Samarivskyi RaionDnipropetrovsk Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.