Solar plant: site data
Solar power plant in Perevizki Khutory, Nikopolskyi Raion, Dnipropetrovsk Oblast
Perevizki Khutory: 1,237 kWh per kWp a year, tilt 36° 1° east of south (PVGIS). 5.1% above the oblast median (1,177). #8 of 135 in the rayon, #8 of 1501 in the oblast.
Nikopol, the rayon centre, is 25 km away. 14 m above sea level. 25 km away: Nikopol, the nearest bigger centre, 1,224 — 1.1% more here. Snow and wind from the nearest regional centre in the DBN — Запоріжжя, 83 km. 9.96 m between rows, pitch 13.83 m (latitude 47.6°).
- Yield of 1 kWp
- 1,237kWh/year
- Tilt
- 36°1° east of south
- 10 kW
- 12,370kWh/year
- Row pitch
- 13.83m · GCR 0.35
- T_min
- -42 °Cregion II, south-eastern
- Snow S₀ / wind W₀
- 1,110 / 460Pa
Ground frame designer
A ground frame for a solar plant: Perevizki Khutory
The designer opens with this place’s coordinates, latitude 47.6° for the row spacing and the DBN loads of the nearest regional centre — Запоріжжя, 83 km: snow 1,110 Pa, wind 460 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 155 kWh/kWp, December: 33 — 4.7 times less.
December: 33 against 28 in the oblast, 17.9% more.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 6,185 | 775 | 165 |
| 10 | 12,370 | 1,550 | 330 |
| 15 | 18,555 | 2,325 | 495 |
Example: a 10 kW ground frame
For the loads of Zaporizhzhia: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 49,705 UAH.
How these numbers are computed
Nearby
- Krasne2 km1,237 kWh/kWp
- Hranitne3 km1,234 kWh/kWp
- Pokrov4 km1,232 kWh/kWp
- Ust-Kamianka5 km1,227 kWh/kWp
- Chortomlyk5 km1,239 kWh/kWp
- Naberezhne6 km1,215 kWh/kWp
All places: Nikopolskyi RaionDnipropetrovsk Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.