Solar plant: site data

Solar power plant in Motronivka, Kamianskyi Raion, Dnipropetrovsk Oblast

Motronivka: 1,167 kWh per kWp a year, tilt 36° 2° east of south (PVGIS). 0.9% below the oblast median (1,177). #241 of 280 in the rayon, #1259 of 1501 in the oblast.

Kamyanske, the rayon centre, is 50 km away. 177 m above sea level. 50 km away: Kamyanske, the nearest bigger centre, 1,184 — 1.5% less here. Snow and wind from the nearest regional centre in the DBN — Дніпро, 84 km. 10.61 m between rows, pitch 14.48 m (latitude 48.6°).

Yield of 1 kWp
1,167kWh/year
Tilt
36°2° east of south
10 kW
11,666kWh/year
Row pitch
14.48m · GCR 0.33
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
1,340 / 470Pa

Ground frame designer

A ground frame for a solar plant: Motronivka

The designer opens with this place’s coordinates, latitude 48.6° for the row spacing and the DBN loads of the nearest regional centre — Дніпро, 84 km: snow 1,340 Pa, wind 470 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

36Jan52Feb92Mar118Apr139May145Jun152Jul150Aug122Sep90Oct44Nov28Dec

July: 152 kWh/kWp, December: 28 — 5.4 times less.

November: 44 against 47 in the oblast, 6.4% less.

Motronivka: plants, kWh
kWpA yearJulyDecember
55,833760140
1011,6661,520280
1517,4992,280420

Snow and wind: Дніпро

Example: a 10 kW ground frame

For the loads of Dnipro: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 49,705 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Kamianskyi RaionDnipropetrovsk Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.