Solar plant: site data

Solar power plant in Loboikivka, Dniprovskyi Raion, Dnipropetrovsk Oblast

Loboikivka: 1,184 kWh per kWp a year, tilt 37° 1° east of south (PVGIS). 0.6% above the oblast median (1,177). #70 of 240 in the rayon, #410 of 1501 in the oblast.

Dnipro, the rayon centre, is 35 km away. 67 m above sea level. 18 km away: Kamyanske, the nearest bigger centre, the same 1,184. Snow and wind from the nearest regional centre in the DBN — Дніпро, 36 km. 10.96 m between rows, pitch 14.78 m (latitude 48.7°).

Yield of 1 kWp
1,184kWh/year
Tilt
37°1° east of south
10 kW
11,838kWh/year
Row pitch
14.78m · GCR 0.32
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
1,340 / 470Pa

Ground frame designer

A ground frame for a solar plant: Loboikivka

The designer opens with this place’s coordinates, latitude 48.7° for the row spacing and the DBN loads of the nearest regional centre — Дніпро, 36 km: snow 1,340 Pa, wind 470 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

36Jan58Feb96Mar119Apr140May144Jun150Jul151Aug123Sep90Oct46Nov30Dec

August: 151 kWh/kWp, December: 30 — 5.0 times less.

February: 58 against 54 in the oblast, 7.4% more.

Loboikivka: plants, kWh
kWpA yearAugustDecember
55,919755150
1011,8381,510300
1517,7572,265450

Snow and wind: Дніпро

Example: a 10 kW ground frame

For the loads of Dnipro: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 49,705 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Dniprovskyi RaionDnipropetrovsk Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.