Solar power plant in Chernechchyna, Samarivskyi Raion, Dnipropetrovsk Oblast

Chernechchyna: 1,156 kWh per kWp a year, tilt 37° 2° east of south (PVGIS). 1.8% below the oblast median (1,177). #95 of 115 in the rayon, #1462 of 1501 in the oblast.

Samar, the rayon centre, is 65 km away. 83 m above sea level. 29 km away: Tsarychanka, the nearest bigger centre, 1,170 — 1.2% less here. Snow and wind from the nearest regional centre in the DBN — Полтава, 54 km. 11.31 m between rows, pitch 15.13 m (latitude 49.1°).

Yield of 1 kWp
1,156kWh/year
Tilt
37°2° east of south
10 kW
11,560kWh/year
Row pitch
15.13m · GCR 0.32
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
1,450 / 470Pa

Ground frame designer

A ground frame for a solar plant: Chernechchyna

The designer opens with this place’s coordinates, latitude 49.1° for the row spacing and the DBN loads of the nearest regional centre — Полтава, 54 km: snow 1,450 Pa, wind 470 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

35Jan54Feb92Mar117Apr138May144Jun149Jul149Aug120Sep88Oct42Nov28Dec

July: 149 kWh/kWp, December: 28 — 5.3 times less.

November: 42 against 47 in the oblast, 10.6% less.

Chernechchyna: plants, kWh
kWpA yearJulyDecember
55,780745140
1011,5601,490280
1517,3402,235420

Snow and wind: Полтава

Example: a 10 kW ground frame

For the loads of Poltava: 11.16 kWp, 18 panels, 389 kg of steel, 12 piles, materials ≈ 52,358 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Samarivskyi RaionDnipropetrovsk Oblast: rayons and towns

Free calculators

Sources