Solar plant: site data

Solar power plant in Buzivka, Samarivskyi Raion, Dnipropetrovsk Oblast

Buzivka: 1,157 kWh per kWp a year, tilt 37° 2° east of south (PVGIS). 1.7% below the oblast median (1,177). #81 of 115 in the rayon, #1435 of 1501 in the oblast.

Samar, the rayon centre, is 57 km away. 84 m above sea level. 36 km away: Karlivka, the nearest bigger centre, 1,144 — 1.2% more here. Snow and wind from the nearest regional centre in the DBN — Полтава, 65 km. 11.32 m between rows, pitch 15.14 m (latitude 49.1°).

Yield of 1 kWp
1,157kWh/year
Tilt
37°2° east of south
10 kW
11,573kWh/year
Row pitch
15.14m · GCR 0.32
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
1,450 / 470Pa

Ground frame designer

A ground frame for a solar plant: Buzivka

The designer opens with this place’s coordinates, latitude 49.1° for the row spacing and the DBN loads of the nearest regional centre — Полтава, 65 km: snow 1,450 Pa, wind 470 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

34Jan54Feb93Mar117Apr138May143Jun150Jul149Aug120Sep88Oct43Nov27Dec

July: 150 kWh/kWp, December: 27 — 5.6 times less.

November: 43 against 47 in the oblast, 8.5% less.

Buzivka: plants, kWh
kWpA yearJulyDecember
55,787750135
1011,5731,500270
1517,3602,250405

Snow and wind: Полтава

Example: a 10 kW ground frame

For the loads of Poltava: 11.16 kWp, 18 panels, 389 kg of steel, 12 piles, materials ≈ 52,358 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Samarivskyi RaionDnipropetrovsk Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.