Solar power plant in Trier, Germany: yield, tilt angle and row spacing

Trier: 1,058 kWh per kWp a year at the optimal tilt of 36°, 1° west of south (PVGIS). 1.3% above the median of the main cities of Germany (1,045). #75 of 193 main cities of Germany by yield. For comparison, Kyiv: 1,114 kWh/kWp — 5.0% less here.

Trier is in Rhineland-Palatinate. Population 100,129 (GeoNames). 141 m above sea level. 64 km away: Saarbrücken, the nearest bigger city, 1,081 kWh/kWp — 2.1% less here. 11.58 m between rows, pitch 15.45 m, GCR 0.31 (latitude 49.8°).

Yield of 1 kWp
1,058kWh/year
Tilt
36°1° west of south
10 kW
10,583kWh/year
Row pitch
15.45m · GCR 0.31
Rank in the country
75of 193 cities

Ground frame designer

A ground frame for a solar plant: Trier

Latitude 49.8°: the tilt and the row pitch follow it. Enter the snow and wind for Germany in the designer, by the national annex to the Eurocode.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

34Jan54Feb95Mar123Apr128May130Jun131Jul119Aug106Sep71Oct38Nov29Dec

July: 131 kWh/kWp, December: 29 — 4.5 times less.

November: 38 against the median of 43 for the main cities of Germany, 11.6% less.

Trier: plants, kWh
kWpA yearJulyDecember
55,292655145
1010,5831,310290
1515,8751,965435

Snow and wind loads

Snow and wind loads for a site in Germany follow DIN EN 1991-1-3/NA (snow load zone, Schneelastzone) and DIN EN 1991-1-4/NA (wind zone, Windzone). Solispec computes loads by the Ukrainian DBN V.1.2-2 only, so this page shows no snow or wind values for Germany: enter the characteristic values from these documents in the designer’s «Own snow S0» and «Own wind W0» fields.

The frame calculation for such a site is preliminary: before installation it must be checked by an engineer who works to the country’s standards.