Germany: solar plant site data

Solar power plant in Stuttgart, Germany: yield, tilt angle and row spacing

Stuttgart: 1,132 kWh per kWp a year at the optimal tilt of 39°, 2° east of south (PVGIS). 8.4% above the median of the main cities of Germany (1,045). #11 of 193 main cities of Germany by yield. For comparison, Kyiv: 1,114 kWh/kWp — 1.6% more here.

Stuttgart is in Baden-Württemberg. Population 612,663 (GeoNames). 252 m above sea level. 152 km away: Frankfurt am Main, the nearest bigger city, 1,082 kWh/kWp — 4.6% more here. 11.54 m between rows, pitch 15.26 m, GCR 0.31 (latitude 48.8°).

Yield of 1 kWp
1,132kWh/year
Tilt
39°2° east of south
10 kW
11,321kWh/year
Row pitch
15.26m · GCR 0.31
Rank in the country
11of 193 cities

Ground frame designer

A ground frame for a solar plant: Stuttgart

Latitude 48.8°: the tilt and the row pitch follow it. Enter the snow and wind for Germany in the designer, by the national annex to the Eurocode.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

47Jan66Feb104Mar121Apr123May128Jun131Jul121Aug110Sep83Oct54Nov45Dec

July: 131 kWh/kWp, December: 45 — 2.9 times less.

December: 45 against the median of 30 for the main cities of Germany, 50.0% more.

Stuttgart: plants, kWh
kWpA yearJulyDecember
55,661655225
1011,3211,310450
1516,9821,965675

Fixed tilt facing south

What a table yields at another tilt than the optimal 39° — for roofs and frames with a standard slope.

Stuttgart: yield at a fixed tilt, kWh/kWp
TiltA yearAgainst the optimum
39° (optimum)1,132—
15°1,061−6.3%
30°1,122−0.9%
45°1,127−0.4%
90°803−29.1%

Snow and wind loads

Snow and wind loads for a site in Germany follow DIN EN 1991-1-3/NA (snow load zone, Schneelastzone) and DIN EN 1991-1-4/NA (wind zone, Windzone). Solispec computes loads by the Ukrainian DBN V.1.2-2 only, so this page shows no snow or wind values for Germany: enter the characteristic values from these documents in the designer’s «Own snow S0» and «Own wind W0» fields.

The frame calculation for such a site is preliminary: before installation it must be checked by an engineer who works to the country’s standards.

Nearby cities

Germany: all cities and regions

Sources

Preliminary calculation: a design needs an engineer’s check.