Solar plant: site data

Solar power plant in Strumok, Dnistrovskyi Raion, Chernivtsi Oblast

Strumok: 1,160 kWh per kWp a year, tilt 36° 1° east of south (PVGIS). 1.6% above the oblast median (1,143). #11 of 113 in the rayon, #54 of 422 in the oblast.

Kelmentsi, the rayon centre, is 24 km away. 269 m above sea level. 24 km away: Kelmentsi, the nearest bigger centre, 1,148 — 1.1% more here. Snow and wind from the nearest regional centre in the DBN — Чернівці, 92 km. 10.55 m between rows, pitch 14.42 m (latitude 48.5°).

Yield of 1 kWp
1,160kWh/year
Tilt
36°1° east of south
10 kW
11,603kWh/year
Row pitch
14.42m · GCR 0.33
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,320 / 500Pa

Ground frame designer

A ground frame for a solar plant: Strumok

The designer opens with this place’s coordinates, latitude 48.5° for the row spacing and the DBN loads of the nearest regional centre — Чернівці, 92 km: snow 1,320 Pa, wind 500 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

37Jan55Feb98Mar122Apr138May138Jun145Jul143Aug118Sep90Oct44Nov34Dec

July: 145 kWh/kWp, December: 34 — 4.3 times less.

January: 37 against 45 in the oblast, 17.8% less.

Strumok: plants, kWh
kWpA yearJulyDecember
55,802725170
1011,6031,450340
1517,4052,175510

Snow and wind: Чернівці

Example: a 10 kW ground frame

For the loads of Chernivtsi: 11.16 kWp, 18 panels, 412 kg of steel, 16 piles, materials ≈ 54,638 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Dnistrovskyi RaionChernivtsi Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.