Solar plant: site data

Solar power plant in Staryy Vovchynets, Chernivetskyi Raion, Chernivtsi Oblast

Staryy Vovchynets: 1,162 kWh per kWp a year, tilt 38° 1° east of south (PVGIS). 1.7% above the oblast median (1,143). #31 of 215 in the rayon, #36 of 422 in the oblast.

Chernivtsi, the rayon centre, is 32 km away. 336 m above sea level. 9 km away: Hlyboka, the nearest bigger centre, the same 1,160. Snow and wind from the nearest regional centre in the DBN — Чернівці, 32 km. 10.70 m between rows, pitch 14.47 m (latitude 48.0°).

Yield of 1 kWp
1,162kWh/year
Tilt
38°1° east of south
10 kW
11,621kWh/year
Row pitch
14.47m · GCR 0.33
T_min
-38 °Cregion IIIA, Carpathian
Snow S₀ / wind W₀
1,320 / 500Pa

Ground frame designer

A ground frame for a solar plant: Staryy Vovchynets

The designer opens with this place’s coordinates, latitude 48.0° for the row spacing and the DBN loads of the nearest regional centre — Чернівці, 32 km: snow 1,320 Pa, wind 500 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

45Jan61Feb98Mar118Apr132May128Jun141Jul137Aug116Sep93Oct52Nov40Dec

July: 141 kWh/kWp, December: 40 — 3.5 times less.

November: 52 against 47 in the oblast, 10.6% more.

Staryy Vovchynets: plants, kWh
kWpA yearJulyDecember
55,811705200
1011,6211,410400
1517,4322,115600

Snow and wind: Чернівці

Example: a 10 kW ground frame

For the loads of Chernivtsi: 11.16 kWp, 18 panels, 412 kg of steel, 16 piles, materials ≈ 54,638 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Chernivetskyi RaionChernivtsi Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.