Solar plant: site data

Solar power plant in Shepit, Vyzhnytskyi Raion, Chernivtsi Oblast

Shepit: 1,006 kWh per kWp a year, tilt 35° 18° east of south (PVGIS). 12.0% below the oblast median (1,143). #94 of 94 in the rayon, #422 of 422 in the oblast.

Vyzhnytsya, the rayon centre, is 49 km away. 925 m above sea level — above 500 m the DBN snow and wind are higher. 46 km away: Verkhovyna, the nearest bigger centre, 1,074 — 6.3% less here. Snow and wind from the nearest regional centre in the DBN — Чернівці, 80 km. 9.83 m between rows, pitch 13.75 m (latitude 47.8°).

Yield of 1 kWp
1,006kWh/year
Tilt
35°18° east of south
10 kW
10,059kWh/year
Row pitch
13.75m · GCR 0.35
T_min
-38 °Cregion IIIA, Carpathian
Snow S₀ / wind W₀
1,320 / 500Pa

Ground frame designer

A ground frame for a solar plant: Shepit

The designer opens with this place’s coordinates, latitude 47.8° for the row spacing and the DBN loads of the nearest regional centre — Чернівці, 80 km: snow 1,320 Pa, wind 500 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

28Jan66Feb94Mar103Apr112May113Jun123Jul121Aug103Sep86Oct46Nov12Dec

July: 123 kWh/kWp, December: 12 — 10.3 times less.

December: 12 against 37 in the oblast, 67.6% less.

Shepit: plants, kWh
kWpA yearJulyDecember
55,03061560
1010,0591,230120
1515,0891,845180

Snow and wind: Чернівці

Example: a 10 kW ground frame

For the loads of Chernivtsi: 11.16 kWp, 18 panels, 412 kg of steel, 16 piles, materials ≈ 54,638 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Vyzhnytskyi RaionChernivtsi Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.