Solar plant: site data

Solar power plant in Roztoky, Vyzhnytskyi Raion, Chernivtsi Oblast

Roztoky: 1,044 kWh per kWp a year, tilt 37° 14° east of south (PVGIS). 8.6% below the oblast median (1,143). #84 of 94 in the rayon, #411 of 422 in the oblast.

Vyzhnytsya, the rayon centre, is 9 km away. 389 m above sea level. 9 km away: Vyzhnytsya, the nearest bigger centre, 1,076 — 3.0% less here. Snow and wind from the nearest regional centre in the DBN — Чернівці, 61 km. 10.58 m between rows, pitch 14.40 m (latitude 48.2°).

Yield of 1 kWp
1,044kWh/year
Tilt
37°14° east of south
10 kW
10,441kWh/year
Row pitch
14.40m · GCR 0.33
T_min
-38 °Cregion IIIA, Carpathian
Snow S₀ / wind W₀
1,320 / 500Pa

Ground frame designer

A ground frame for a solar plant: Roztoky

The designer opens with this place’s coordinates, latitude 48.2° for the row spacing and the DBN loads of the nearest regional centre — Чернівці, 61 km: snow 1,320 Pa, wind 500 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

42Jan61Feb92Mar105Apr116May115Jun126Jul124Aug104Sep82Oct52Nov25Dec

July: 126 kWh/kWp, December: 25 — 5.0 times less.

December: 25 against 37 in the oblast, 32.4% less.

Roztoky: plants, kWh
kWpA yearJulyDecember
55,221630125
1010,4411,260250
1515,6611,890375

Snow and wind: Чернівці

Example: a 10 kW ground frame

For the loads of Chernivtsi: 11.16 kWp, 18 panels, 412 kg of steel, 16 piles, materials ≈ 54,638 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Vyzhnytskyi RaionChernivtsi Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.