Solar plant: site data

Solar power plant in Pryhorodok, Dnistrovskyi Raion, Chernivtsi Oblast

Pryhorodok: 1,128 kWh per kWp a year, tilt 36° 3° west of south (PVGIS). 1.2% below the oblast median (1,143). #109 of 113 in the rayon, #312 of 422 in the oblast.

Kelmentsi, the rayon centre, is 32 km away. 135 m above sea level. 21 km away: Kamyanets-Podilskyi, the nearest bigger centre, the same 1,129. Snow and wind from the nearest regional centre in the DBN — Чернівці, 44 km. 10.59 m between rows, pitch 14.46 m (latitude 48.5°).

Yield of 1 kWp
1,128kWh/year
Tilt
36°3° west of south
10 kW
11,283kWh/year
Row pitch
14.46m · GCR 0.33
T_min
-38 °Cregion IIIA, Carpathian
Snow S₀ / wind W₀
1,320 / 500Pa

Ground frame designer

A ground frame for a solar plant: Pryhorodok

The designer opens with this place’s coordinates, latitude 48.5° for the row spacing and the DBN loads of the nearest regional centre — Чернівці, 44 km: snow 1,320 Pa, wind 500 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

37Jan53Feb95Mar120Apr135May135Jun143Jul139Aug115Sep86Oct41Nov31Dec

July: 143 kWh/kWp, December: 31 — 4.6 times less.

January: 37 against 45 in the oblast, 17.8% less.

Pryhorodok: plants, kWh
kWpA yearJulyDecember
55,642715155
1011,2831,430310
1516,9252,145465

Snow and wind: Чернівці

Example: a 10 kW ground frame

For the loads of Chernivtsi: 11.16 kWp, 18 panels, 412 kg of steel, 16 piles, materials ≈ 54,638 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Dnistrovskyi RaionChernivtsi Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.