Solar power plant in Petrashivka, Chernivetskyi Raion, Chernivtsi Oblast

Petrashivka: 1,169 kWh per kWp a year, tilt 38° 1° east of south (PVGIS). 2.3% above the oblast median (1,143). #10 of 215 in the rayon, #10 of 422 in the oblast.

Chernivtsi, the rayon centre, is 25 km away. 346 m above sea level. 13 km away: Hlyboka, the nearest bigger centre, 1,160 — 0.8% more here. Snow and wind from the nearest regional centre in the DBN — Чернівці, 24 km. 10.77 m between rows, pitch 14.54 m (latitude 48.1°).

Yield of 1 kWp
1,169kWh/year
Tilt
38°1° east of south
10 kW
11,690kWh/year
Row pitch
14.54m · GCR 0.33
T_min
-38 °Cregion IIIA, Carpathian
Snow S₀ / wind W₀
1,320 / 500Pa

Ground frame designer

A ground frame for a solar plant: Petrashivka

The designer opens with this place’s coordinates, latitude 48.1° for the row spacing and the DBN loads of the nearest regional centre — Чернівці, 24 km: snow 1,320 Pa, wind 500 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

48Jan62Feb100Mar118Apr132May129Jun141Jul138Aug117Sep92Oct51Nov42Dec

July: 141 kWh/kWp, December: 42 — 3.4 times less.

December: 42 against 37 in the oblast, 13.5% more.

Petrashivka: plants, kWh
kWpA yearJulyDecember
55,845705210
1011,6901,410420
1517,5352,115630

Snow and wind: Чернівці

Example: a 10 kW ground frame

For the loads of Chernivtsi: 11.16 kWp, 18 panels, 412 kg of steel, 16 piles, materials ≈ 54,638 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Chernivetskyi RaionChernivtsi Oblast: rayons and towns