Solar plant: site data

Solar power plant in Ostrytsya, Chernivetskyi Raion, Chernivtsi Oblast

Ostrytsya: 1,144 kWh per kWp a year, tilt 37° 4° east of south (PVGIS). Exactly the oblast median (1,143). #125 of 215 in the rayon, #194 of 422 in the oblast.

Chernivtsi, the rayon centre, is 10 km away. 196 m above sea level. 10 km away: Chernivtsi, the nearest bigger centre, 1,151 — 0.6% less here. Snow and wind from the nearest regional centre in the DBN — Чернівці, 9 km. 10.64 m between rows, pitch 14.46 m (latitude 48.3°).

Yield of 1 kWp
1,144kWh/year
Tilt
37°4° east of south
10 kW
11,441kWh/year
Row pitch
14.46m · GCR 0.33
T_min
-38 °Cregion IIIA, Carpathian
Snow S₀ / wind W₀
1,320 / 500Pa

Ground frame designer

A ground frame for a solar plant: Ostrytsya

The designer opens with this place’s coordinates, latitude 48.3° for the row spacing and the DBN loads of the nearest regional centre — Чернівці, 9 km: snow 1,320 Pa, wind 500 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

43Jan60Feb98Mar119Apr132May131Jun142Jul138Aug115Sep87Oct45Nov34Dec

July: 142 kWh/kWp, December: 34 — 4.2 times less.

December: 34 against 37 in the oblast, 8.1% less.

Ostrytsya: plants, kWh
kWpA yearJulyDecember
55,721710170
1011,4411,420340
1517,1622,130510

Snow and wind: Чернівці

Example: a 10 kW ground frame

For the loads of Chernivtsi: 11.16 kWp, 18 panels, 412 kg of steel, 16 piles, materials ≈ 54,638 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Chernivetskyi RaionChernivtsi Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.