Solar plant: site data

Solar power plant in Lomachyntsi, Dnistrovskyi Raion, Chernivtsi Oblast

Lomachyntsi: 1,161 kWh per kWp a year, tilt 37° 1° east of south (PVGIS). 1.6% above the oblast median (1,143). #9 of 113 in the rayon, #48 of 422 in the oblast.

Kelmentsi, the rayon centre, is 42 km away. 239 m above sea level. 35 km away: Mohyliv-Podilskyy, the nearest bigger centre, the same 1,160. Snow and wind from the nearest regional centre in the DBN — Хмельницький, 97 km. 10.89 m between rows, pitch 14.71 m (latitude 48.6°).

Yield of 1 kWp
1,161kWh/year
Tilt
37°1° east of south
10 kW
11,609kWh/year
Row pitch
14.71m · GCR 0.33
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,340 / 500Pa

Ground frame designer

A ground frame for a solar plant: Lomachyntsi

The designer opens with this place’s coordinates, latitude 48.6° for the row spacing and the DBN loads of the nearest regional centre — Хмельницький, 97 km: snow 1,340 Pa, wind 500 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

39Jan55Feb99Mar121Apr138May137Jun145Jul142Aug117Sep90Oct43Nov34Dec

July: 145 kWh/kWp, December: 34 — 4.3 times less.

January: 39 against 45 in the oblast, 13.3% less.

Lomachyntsi: plants, kWh
kWpA yearJulyDecember
55,805725170
1011,6091,450340
1517,4142,175510

Snow and wind: Хмельницький

Example: a 10 kW ground frame

For the loads of Khmelnytskyi: 11.16 kWp, 18 panels, 415 kg of steel, 16 piles, materials ≈ 55,054 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Dnistrovskyi RaionChernivtsi Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.