Solar power plant in Kostryzhivka, Chernivetskyi Raion, Chernivtsi Oblast

Kostryzhivka: 1,117 kWh per kWp a year, tilt 36° 3° east of south (PVGIS). 2.3% below the oblast median (1,143). #211 of 215 in the rayon, #353 of 422 in the oblast.

Chernivtsi, the rayon centre, is 44 km away. 165 m above sea level. 18 km away: Zastavna, the nearest bigger centre, 1,131 — 1.3% less here. Snow and wind from the nearest regional centre in the DBN — Чернівці, 44 km. 10.69 m between rows, pitch 14.56 m (latitude 48.7°).

Yield of 1 kWp
1,117kWh/year
Tilt
36°3° east of south
10 kW
11,167kWh/year
Row pitch
14.56m · GCR 0.33
T_min
-38 °Cregion IIIA, Carpathian
Snow S₀ / wind W₀
1,320 / 500Pa

Ground frame designer

A ground frame for a solar plant: Kostryzhivka

The designer opens with this place’s coordinates, latitude 48.7° for the row spacing and the DBN loads of the nearest regional centre — Чернівці, 44 km: snow 1,320 Pa, wind 500 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

39Jan53Feb96Mar118Apr131May131Jun139Jul135Aug113Sep86Oct42Nov32Dec

July: 139 kWh/kWp, December: 32 — 4.3 times less.

December: 32 against 37 in the oblast, 13.5% less.

Kostryzhivka: plants, kWh
kWpA yearJulyDecember
55,584695160
1011,1671,390320
1516,7512,085480

Snow and wind: Чернівці

Example: a 10 kW ground frame

For the loads of Chernivtsi: 11.16 kWp, 18 panels, 412 kg of steel, 16 piles, materials ≈ 54,638 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Chernivetskyi RaionChernivtsi Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.