Koshulyany: 1,157 kWh per kWp a year, tilt 37° facing south (PVGIS). 1.3% above the oblast median (1,143). #22 of 113 in the rayon, #86 of 422 in the oblast.
Kelmentsi, the rayon centre, is 32 km away. 115 m above sea level. 22 km away: Novoselytsya, the nearest bigger centre, the same 1,158. Snow and wind from the nearest regional centre in the DBN — Чернівці, 46 km. 10.63 m between rows, pitch 14.45 m (latitude 48.2°).
- Yield of 1 kWp
- 1,157kWh/year
- Tilt
- 37°facing south
- 10 kW
- 11,573kWh/year
- Row pitch
- 14.45m · GCR 0.33
- T_min
- -38 °Cregion IIIA, Carpathian
- Snow S₀ / wind W₀
- 1,320 / 500Pa
Ground frame designer
A ground frame for a solar plant: Koshulyany
The designer opens with this place’s coordinates, latitude 48.2° for the row spacing and the DBN loads of the nearest regional centre — Чернівці, 46 km: snow 1,320 Pa, wind 500 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 143 kWh/kWp, December: 35 — 4.1 times less.
January: 41 against 45 in the oblast, 8.9% less.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 5,787 | 715 | 175 |
| 10 | 11,573 | 1,430 | 350 |
| 15 | 17,360 | 2,145 | 525 |
Example: a 10 kW ground frame
For the loads of Chernivtsi: 11.16 kWp, 18 panels, 412 kg of steel, 16 piles, materials ≈ 54,638 UAH.
How these numbers are computed
Nearby
- Nehryntsi2 km1,158 kWh/kWp
- Mamalyha2 km1,151 kWh/kWp
- Dranytsya3 km1,158 kWh/kWp
- Kostychany4 km1,158 kWh/kWp
- Dumeny5 km1,158 kWh/kWp
- Novoivankivtsi6 km1,159 kWh/kWp
All places: Dnistrovskyi RaionChernivtsi Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.