Solar plant: site data

Solar power plant in Klishkivtsi, Dnistrovskyi Raion, Chernivtsi Oblast

Klishkivtsi: 1,147 kWh per kWp a year, tilt 37° 1° east of south (PVGIS). Exactly the oblast median (1,143). #55 of 113 in the rayon, #176 of 422 in the oblast.

Kelmentsi, the rayon centre, is 43 km away. 228 m above sea level. 23 km away: Novoselytsya, the nearest bigger centre, 1,158 — 1.0% less here. Snow and wind from the nearest regional centre in the DBN — Чернівці, 27 km. 10.76 m between rows, pitch 14.58 m (latitude 48.4°).

Yield of 1 kWp
1,147kWh/year
Tilt
37°1° east of south
10 kW
11,468kWh/year
Row pitch
14.58m · GCR 0.33
T_min
-38 °Cregion IIIA, Carpathian
Snow S₀ / wind W₀
1,320 / 500Pa

Ground frame designer

A ground frame for a solar plant: Klishkivtsi

The designer opens with this place’s coordinates, latitude 48.4° for the row spacing and the DBN loads of the nearest regional centre — Чернівці, 27 km: snow 1,320 Pa, wind 500 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

42Jan58Feb98Mar119Apr133May133Jun142Jul138Aug115Sep88Oct44Nov36Dec

July: 142 kWh/kWp, December: 36 — 3.9 times less.

January: 42 against 45 in the oblast, 6.7% less.

Klishkivtsi: plants, kWh
kWpA yearJulyDecember
55,734710180
1011,4681,420360
1517,2022,130540

Snow and wind: Чернівці

Example: a 10 kW ground frame

For the loads of Chernivtsi: 11.16 kWp, 18 panels, 412 kg of steel, 16 piles, materials ≈ 54,638 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Dnistrovskyi RaionChernivtsi Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.