Solar plant: site data

Solar power plant in Hreblyna, Vyzhnytskyi Raion, Chernivtsi Oblast

Hreblyna: 1,079 kWh per kWp a year, tilt 37° 2° west of south (PVGIS). 5.6% below the oblast median (1,143). #65 of 94 in the rayon, #392 of 422 in the oblast.

Vyzhnytsya, the rayon centre, is 22 km away. 692 m above sea level — above 500 m the DBN snow and wind are higher. 13 km away: Verkhovyna, the nearest bigger centre, the same 1,074. Snow and wind from the nearest regional centre in the DBN — Чернівці, 74 km. 10.53 m between rows, pitch 14.35 m (latitude 48.1°).

Yield of 1 kWp
1,079kWh/year
Tilt
37°2° west of south
10 kW
10,785kWh/year
Row pitch
14.35m · GCR 0.33
T_min
-38 °Cregion IIIA, Carpathian
Snow S₀ / wind W₀
1,320 / 500Pa

Ground frame designer

A ground frame for a solar plant: Hreblyna

The designer opens with this place’s coordinates, latitude 48.1° for the row spacing and the DBN loads of the nearest regional centre — Чернівці, 74 km: snow 1,320 Pa, wind 500 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

50Jan64Feb91Mar107Apr114May116Jun125Jul124Aug104Sep86Oct58Nov40Dec

July: 125 kWh/kWp, December: 40 — 3.1 times less.

November: 58 against 47 in the oblast, 23.4% more.

Hreblyna: plants, kWh
kWpA yearJulyDecember
55,393625200
1010,7851,250400
1516,1781,875600

Snow and wind: Чернівці

Example: a 10 kW ground frame

For the loads of Chernivtsi: 11.16 kWp, 18 panels, 412 kg of steel, 16 piles, materials ≈ 54,638 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Vyzhnytskyi RaionChernivtsi Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.