Chudei: 1,143 kWh per kWp a year, tilt 40° facing south (PVGIS). Exactly the oblast median (1,143). #133 of 215 in the rayon, #212 of 422 in the oblast.
Chernivtsi, the rayon centre, is 35 km away. 387 m above sea level. 14 km away: Storozhynets, the nearest bigger centre, 1,153 — 0.9% less here. Snow and wind from the nearest regional centre in the DBN — Чернівці, 36 km. 11.21 m between rows, pitch 14.87 m (latitude 48.1°).
- Yield of 1 kWp
- 1,143kWh/year
- Tilt
- 40°facing south
- 10 kW
- 11,425kWh/year
- Row pitch
- 14.87m · GCR 0.32
- T_min
- -38 °Cregion IIIA, Carpathian
- Snow S₀ / wind W₀
- 1,320 / 500Pa
Ground frame designer
A ground frame for a solar plant: Chudei
The designer opens with this place’s coordinates, latitude 48.1° for the row spacing and the DBN loads of the nearest regional centre — Чернівці, 36 km: snow 1,320 Pa, wind 500 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 131 kWh/kWp, December: 47 — 2.8 times less.
January: 58 against 45 in the oblast, 28.9% more.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 5,713 | 655 | 235 |
| 10 | 11,425 | 1,310 | 470 |
| 15 | 17,138 | 1,965 | 705 |
Example: a 10 kW ground frame
For the loads of Chernivtsi: 11.16 kWp, 18 panels, 412 kg of steel, 16 piles, materials ≈ 54,638 UAH.
How these numbers are computed
Nearby
- Yizhivtsi3 km1,142 kWh/kWp
- Budenets4 km1,151 kWh/kWp
- Cheresh5 km1,152 kWh/kWp
- Krasnoyilsk6 km1,139 kWh/kWp
- Nova Krasnoshora6 km1,135 kWh/kWp
- Verkhni Petrivtsi6 km1,149 kWh/kWp
All places: Chernivetskyi RaionChernivtsi Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.