Solar plant: site data

Solar power plant in Chortoryya, Vyzhnytskyi Raion, Chernivtsi Oblast

Chortoryya: 1,134 kWh per kWp a year, tilt 38° 1° west of south (PVGIS). 0.7% below the oblast median (1,143). #14 of 94 in the rayon, #284 of 422 in the oblast.

Vyzhnytsya, the rayon centre, is 32 km away. 198 m above sea level. 16 km away: Kitsman, the nearest bigger centre, the same 1,137. Snow and wind from the nearest regional centre in the DBN — Чернівці, 29 km. 10.97 m between rows, pitch 14.74 m (latitude 48.4°).

Yield of 1 kWp
1,134kWh/year
Tilt
38°1° west of south
10 kW
11,342kWh/year
Row pitch
14.74m · GCR 0.32
T_min
-38 °Cregion IIIA, Carpathian
Snow S₀ / wind W₀
1,320 / 500Pa

Ground frame designer

A ground frame for a solar plant: Chortoryya

The designer opens with this place’s coordinates, latitude 48.4° for the row spacing and the DBN loads of the nearest regional centre — Чернівці, 29 km: snow 1,320 Pa, wind 500 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

45Jan59Feb97Mar117Apr128May127Jun138Jul135Aug113Sep89Oct49Nov37Dec

July: 138 kWh/kWp, December: 37 — 3.7 times less.

November: 49 against 47 in the oblast, 4.3% more.

Chortoryya: plants, kWh
kWpA yearJulyDecember
55,671690185
1011,3421,380370
1517,0132,070555

Snow and wind: Чернівці

Example: a 10 kW ground frame

For the loads of Chernivtsi: 11.16 kWp, 18 panels, 412 kg of steel, 16 piles, materials ≈ 54,638 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Vyzhnytskyi RaionChernivtsi Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.