Solar plant: site data

Solar power plant in Cheponosy, Dnistrovskyi Raion, Chernivtsi Oblast

Cheponosy: 1,142 kWh per kWp a year, tilt 37° 1° east of south (PVGIS). Exactly the oblast median (1,143). #83 of 113 in the rayon, #223 of 422 in the oblast.

Kelmentsi, the rayon centre, is 35 km away. 221 m above sea level. 28 km away: Kamyanets-Podilskyi, the nearest bigger centre, 1,129 — 1.2% more here. Snow and wind from the nearest regional centre in the DBN — Чернівці, 37 km. 10.81 m between rows, pitch 14.63 m (latitude 48.5°).

Yield of 1 kWp
1,142kWh/year
Tilt
37°1° east of south
10 kW
11,416kWh/year
Row pitch
14.63m · GCR 0.33
T_min
-38 °Cregion IIIA, Carpathian
Snow S₀ / wind W₀
1,320 / 500Pa

Ground frame designer

A ground frame for a solar plant: Cheponosy

The designer opens with this place’s coordinates, latitude 48.5° for the row spacing and the DBN loads of the nearest regional centre — Чернівці, 37 km: snow 1,320 Pa, wind 500 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

39Jan55Feb96Mar120Apr135May134Jun143Jul139Aug116Sep87Oct43Nov34Dec

July: 143 kWh/kWp, December: 34 — 4.2 times less.

January: 39 against 45 in the oblast, 13.3% less.

Cheponosy: plants, kWh
kWpA yearJulyDecember
55,708715170
1011,4161,430340
1517,1242,145510

Snow and wind: Чернівці

Example: a 10 kW ground frame

For the loads of Chernivtsi: 11.16 kWp, 18 panels, 412 kg of steel, 16 piles, materials ≈ 54,638 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Dnistrovskyi RaionChernivtsi Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.