Buzovytsya: 1,155 kWh per kWp a year, tilt 37° 1° east of south (PVGIS). 1.1% above the oblast median (1,143). #30 of 113 in the rayon, #109 of 422 in the oblast.
Kelmentsi, the rayon centre, is 8 km away. 241 m above sea level. 8 km away: Kelmentsi, the nearest bigger centre, 1,148 — 0.6% more here. Snow and wind from the nearest regional centre in the DBN — Чернівці, 77 km. 10.82 m between rows, pitch 14.64 m (latitude 48.5°).
- Yield of 1 kWp
- 1,155kWh/year
- Tilt
- 37°1° east of south
- 10 kW
- 11,551kWh/year
- Row pitch
- 14.64m · GCR 0.33
- T_min
- -40 °Cregion I, north-western
- Snow S₀ / wind W₀
- 1,320 / 500Pa
Ground frame designer
A ground frame for a solar plant: Buzovytsya
The designer opens with this place’s coordinates, latitude 48.5° for the row spacing and the DBN loads of the nearest regional centre — Чернівці, 77 km: snow 1,320 Pa, wind 500 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 144 kWh/kWp, December: 34 — 4.2 times less.
January: 38 against 45 in the oblast, 15.6% less.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 5,776 | 720 | 170 |
| 10 | 11,551 | 1,440 | 340 |
| 15 | 17,327 | 2,160 | 510 |
Example: a 10 kW ground frame
For the loads of Chernivtsi: 11.16 kWp, 18 panels, 412 kg of steel, 16 piles, materials ≈ 54,638 UAH.
How these numbers are computed
Nearby
- Burdyuh4 km1,151 kWh/kWp
- Dnistrivka4 km1,153 kWh/kWp
- Vovchynets5 km1,155 kWh/kWp
- Babyn6 km1,146 kWh/kWp
- Mayorka7 km1,156 kWh/kWp
- Ivanivtsi8 km1,157 kWh/kWp
All places: Dnistrovskyi RaionChernivtsi Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.