Solar plant: site data

Solar power plant in Bukivka, Chernivetskyi Raion, Chernivtsi Oblast

Bukivka: 1,170 kWh per kWp a year, tilt 38° 1° east of south (PVGIS). 2.4% above the oblast median (1,143). #7 of 215 in the rayon, #7 of 422 in the oblast.

Chernivtsi, the rayon centre, is 29 km away. 346 m above sea level. 13 km away: Hlyboka, the nearest bigger centre, 1,160 — 0.9% more here. Snow and wind from the nearest regional centre in the DBN — Чернівці, 29 km. 10.73 m between rows, pitch 14.50 m (latitude 48.1°).

Yield of 1 kWp
1,170kWh/year
Tilt
38°1° east of south
10 kW
11,699kWh/year
Row pitch
14.50m · GCR 0.33
T_min
-38 °Cregion IIIA, Carpathian
Snow S₀ / wind W₀
1,320 / 500Pa

Ground frame designer

A ground frame for a solar plant: Bukivka

The designer opens with this place’s coordinates, latitude 48.1° for the row spacing and the DBN loads of the nearest regional centre — Чернівці, 29 km: snow 1,320 Pa, wind 500 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

44Jan62Feb100Mar119Apr133May129Jun141Jul138Aug117Sep93Oct52Nov40Dec

July: 141 kWh/kWp, December: 40 — 3.5 times less.

November: 52 against 47 in the oblast, 10.6% more.

Bukivka: plants, kWh
kWpA yearJulyDecember
55,850705200
1011,6991,410400
1517,5492,115600

Snow and wind: Чернівці

Example: a 10 kW ground frame

For the loads of Chernivtsi: 11.16 kWp, 18 panels, 412 kg of steel, 16 piles, materials ≈ 54,638 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Chernivetskyi RaionChernivtsi Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.