Solar plant: site data

Solar power plant in Berestya, Chernivetskyi Raion, Chernivtsi Oblast

Berestya: 1,151 kWh per kWp a year, tilt 37° 1° east of south (PVGIS). 0.8% above the oblast median (1,143). #100 of 215 in the rayon, #142 of 422 in the oblast.

Chernivtsi, the rayon centre, is 32 km away. 167 m above sea level. 14 km away: Novoselytsya, the nearest bigger centre, 1,158 — 0.6% less here. Snow and wind from the nearest regional centre in the DBN — Чернівці, 31 km. 10.69 m between rows, pitch 14.51 m (latitude 48.3°).

Yield of 1 kWp
1,151kWh/year
Tilt
37°1° east of south
10 kW
11,514kWh/year
Row pitch
14.51m · GCR 0.33
T_min
-38 °Cregion IIIA, Carpathian
Snow S₀ / wind W₀
1,320 / 500Pa

Ground frame designer

A ground frame for a solar plant: Berestya

The designer opens with this place’s coordinates, latitude 48.3° for the row spacing and the DBN loads of the nearest regional centre — Чернівці, 31 km: snow 1,320 Pa, wind 500 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

41Jan57Feb99Mar120Apr134May133Jun143Jul139Aug117Sep88Oct45Nov36Dec

July: 143 kWh/kWp, December: 36 — 4.0 times less.

January: 41 against 45 in the oblast, 8.9% less.

Berestya: plants, kWh
kWpA yearJulyDecember
55,757715180
1011,5141,430360
1517,2712,145540

Snow and wind: Чернівці

Example: a 10 kW ground frame

For the loads of Chernivtsi: 11.16 kWp, 18 panels, 412 kg of steel, 16 piles, materials ≈ 54,638 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Chernivetskyi RaionChernivtsi Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.