Anadoly: 1,139 kWh per kWp a year, tilt 36° 1° east of south (PVGIS). Exactly the oblast median (1,143). #92 of 113 in the rayon, #246 of 422 in the oblast.

Kelmentsi, the rayon centre, is 22 km away. 123 m above sea level. 22 km away: Kamyanets-Podilskyi, the nearest bigger centre, 1,129 — 0.9% more here. Snow and wind from the nearest regional centre in the DBN — Чернівці, 48 km. 10.56 m between rows, pitch 14.43 m (latitude 48.5°).

Yield of 1 kWp
1,139kWh/year
Tilt
36°1° east of south
10 kW
11,390kWh/year
Row pitch
14.43m · GCR 0.33
T_min
-38 °Cregion IIIA, Carpathian
Snow S₀ / wind W₀
1,320 / 500Pa

Ground frame designer

A ground frame for a solar plant: Anadoly

The designer opens with this place’s coordinates, latitude 48.5° for the row spacing and the DBN loads of the nearest regional centre — Чернівці, 48 km: snow 1,320 Pa, wind 500 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

39Jan53Feb96Mar120Apr135May135Jun142Jul139Aug115Sep87Oct43Nov34Dec

July: 142 kWh/kWp, December: 34 — 4.2 times less.

January: 39 against 45 in the oblast, 13.3% less.

Anadoly: plants, kWh
kWpA yearJulyDecember
55,695710170
1011,3901,420340
1517,0852,130510

Snow and wind: Чернівці

Example: a 10 kW ground frame

For the loads of Chernivtsi: 11.16 kWp, 18 panels, 412 kg of steel, 16 piles, materials ≈ 54,638 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed