Solar plant: site data
Solar power plant in Yabluneve, Nizhynskyi Raion, Chernihiv Oblast
Yabluneve: 1,110 kWh per kWp a year, tilt 37° 4° east of south (PVGIS). Exactly the oblast median (1,108). #195 of 327 in the rayon, #696 of 1558 in the oblast.
Nizhyn, the rayon centre, is 6 km away. 128 m above sea level. 6 km away: Nizhyn, the nearest bigger centre, the same 1,108. Snow and wind from the nearest regional centre in the DBN — Чернігів, 61 km. 13.20 m between rows, pitch 17.02 m (latitude 51.1°).
- Yield of 1 kWp
- 1,110kWh/year
- Tilt
- 37°4° east of south
- 10 kW
- 11,096kWh/year
- Row pitch
- 17.02m · GCR 0.28
- T_min
- -40 °Cregion I, north-western
- Snow S₀ / wind W₀
- 1,720 / 410Pa
Ground frame designer
A ground frame for a solar plant: Yabluneve
The designer opens with this place’s coordinates, latitude 51.1° for the row spacing and the DBN loads of the nearest regional centre — Чернігів, 61 km: snow 1,720 Pa, wind 410 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
June: 144 kWh/kWp, December: 25 — 5.8 times less.
January: 33 against 35 in the oblast, 5.7% less.
| kWp | A year | June | December |
|---|---|---|---|
| 5 | 5,548 | 720 | 125 |
| 10 | 11,096 | 1,440 | 250 |
| 15 | 16,644 | 2,160 | 375 |
Example: a 10 kW ground frame
For the loads of Chernihiv: 11.16 kWp, 18 panels, 389 kg of steel, 12 piles, materials ≈ 52,358 UAH.
How these numbers are computed
Nearby
- Yunist3 km1,113 kWh/kWp
- Lypiv Rih5 km1,111 kWh/kWp
- Berezanka5 km1,110 kWh/kWp
- Kabluky5 km1,107 kWh/kWp
- Maherky6 km1,115 kWh/kWp
- Nizhyn6 km1,108 kWh/kWp
All places: Nizhynskyi RaionChernihiv Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.