Solar plant: site data

Solar power plant in Vostochne, Novhorod-Siverskyi Raion, Chernihiv Oblast

Vostochne: 1,098 kWh per kWp a year, tilt 39° 2° east of south (PVGIS). 0.9% below the oblast median (1,108). #51 of 247 in the rayon, #1058 of 1558 in the oblast.

Novhorod-Siverskyi, the rayon centre, is 22 km away. 167 m above sea level. 22 km away: Novhorod-Siverskyi, the nearest bigger centre, 1,083 — 1.3% more here. Snow and wind from the nearest regional centre in the DBN — Чернігів, 128 km. 14.98 m between rows, pitch 18.70 m (latitude 52.0°).

Yield of 1 kWp
1,098kWh/year
Tilt
39°2° east of south
10 kW
10,977kWh/year
Row pitch
18.70m · GCR 0.26
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,720 / 410Pa

Ground frame designer

A ground frame for a solar plant: Vostochne

The designer opens with this place’s coordinates, latitude 52.0° for the row spacing and the DBN loads of the nearest regional centre — Чернігів, 128 km: snow 1,720 Pa, wind 410 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

35Jan61Feb99Mar116Apr139May142Jun138Jul135Aug107Sep72Oct30Nov24Dec

June: 142 kWh/kWp, December: 24 — 5.9 times less.

November: 30 against 33 in the oblast, 9.1% less.

Vostochne: plants, kWh
kWpA yearJuneDecember
55,489710120
1010,9771,420240
1516,4662,130360

Snow and wind: Чернігів

Example: a 10 kW ground frame

For the loads of Chernihiv: 11.16 kWp, 18 panels, 389 kg of steel, 12 piles, materials ≈ 52,358 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Novhorod-Siverskyi RaionChernihiv Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.