Solar plant: site data
Solar power plant in Velykyi Hai, Novhorod-Siverskyi Raion, Chernihiv Oblast
Velykyi Hai: 1,084 kWh per kWp a year, tilt 39° 2° east of south (PVGIS). 2.2% below the oblast median (1,108). #170 of 247 in the rayon, #1340 of 1558 in the oblast.
Novhorod-Siverskyi, the rayon centre, is 30 km away. 175 m above sea level. 30 km away: Novhorod-Siverskyi, the nearest bigger centre, the same 1,083. Snow and wind from the nearest regional centre in the DBN — Чернігів, 152 km. 15.28 m between rows, pitch 19.00 m (latitude 52.3°).
- Yield of 1 kWp
- 1,084kWh/year
- Tilt
- 39°2° east of south
- 10 kW
- 10,837kWh/year
- Row pitch
- 19.00m · GCR 0.25
- T_min
- -40 °Cregion I, north-western
- Snow S₀ / wind W₀
- 1,720 / 410Pa
Ground frame designer
A ground frame for a solar plant: Velykyi Hai
The designer opens with this place’s coordinates, latitude 52.3° for the row spacing and the DBN loads of the nearest regional centre — Чернігів, 152 km: snow 1,720 Pa, wind 410 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
June: 139 kWh/kWp, December: 24 — 5.8 times less.
November: 30 against 33 in the oblast, 9.1% less.
| kWp | A year | June | December |
|---|---|---|---|
| 5 | 5,419 | 695 | 120 |
| 10 | 10,837 | 1,390 | 240 |
| 15 | 16,256 | 2,085 | 360 |
Example: a 10 kW ground frame
For the loads of Chernihiv: 11.16 kWp, 18 panels, 389 kg of steel, 12 piles, materials ≈ 52,358 UAH.
How these numbers are computed
Nearby
- Vylchyky2 km1,084 kWh/kWp
- Zoria2 km1,084 kWh/kWp
- Movchaniv2 km1,085 kWh/kWp
- Mykolaivske4 km1,088 kWh/kWp
- Budo Vorobivska5 km1,085 kWh/kWp
- Mykhailivka5 km1,089 kWh/kWp
All places: Novhorod-Siverskyi RaionChernihiv Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.