Solar plant: site data
Solar power plant in Udaitsi, Prylutskyi Raion, Chernihiv Oblast
Udaitsi: 1,127 kWh per kWp a year, tilt 38° 2° east of south (PVGIS). 1.7% above the oblast median (1,108). #18 of 285 in the rayon, #72 of 1558 in the oblast.
Pryluky, the rayon centre, is 17 km away. 104 m above sea level. 17 km away: Pryluky, the nearest bigger centre, 1,116 — 0.9% more here. Snow and wind from the nearest regional centre in the DBN — Черкаси, 117 km. 12.82 m between rows, pitch 16.59 m (latitude 50.5°).
- Yield of 1 kWp
- 1,127kWh/year
- Tilt
- 38°2° east of south
- 10 kW
- 11,266kWh/year
- Row pitch
- 16.59m · GCR 0.29
- T_min
- -40 °Cregion I, north-western
- Snow S₀ / wind W₀
- 1,520 / 420Pa
Ground frame designer
A ground frame for a solar plant: Udaitsi
The designer opens with this place’s coordinates, latitude 50.5° for the row spacing and the DBN loads of the nearest regional centre — Черкаси, 117 km: snow 1,520 Pa, wind 420 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 144 kWh/kWp, December: 24 — 6.0 times less.
November: 36 against 33 in the oblast, 9.1% more.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 5,633 | 720 | 120 |
| 10 | 11,266 | 1,440 | 240 |
| 15 | 16,899 | 2,160 | 360 |
Example: a 10 kW ground frame
For the loads of Cherkasy: 11.16 kWp, 18 panels, 346 kg of steel, 12 piles, materials ≈ 51,820 UAH.
How these numbers are computed
Nearby
- Kulyshivka3 km1,124 kWh/kWp
- Makiyivka4 km1,128 kWh/kWp
- Mokhnivka5 km1,128 kWh/kWp
- Polonky5 km1,125 kWh/kWp
- Nova Hreblia5 km1,128 kWh/kWp
- Turkivka5 km1,128 kWh/kWp
All places: Prylutskyi RaionChernihiv Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.