Solar plant: site data

Solar power plant in Tertyshnyky, Nizhynskyi Raion, Chernihiv Oblast

Tertyshnyky: 1,114 kWh per kWp a year, tilt 37° 2° east of south (PVGIS). 0.5% above the oblast median (1,108). #153 of 327 in the rayon, #540 of 1558 in the oblast.

Nizhyn, the rayon centre, is 26 km away. 131 m above sea level. 26 km away: Nizhyn, the nearest bigger centre, 1,108 — 0.5% more here. Snow and wind from the nearest regional centre in the DBN — Чернігів, 76 km. 12.94 m between rows, pitch 16.76 m (latitude 50.9°).

Yield of 1 kWp
1,114kWh/year
Tilt
37°2° east of south
10 kW
11,135kWh/year
Row pitch
16.76m · GCR 0.29
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,720 / 410Pa

Ground frame designer

A ground frame for a solar plant: Tertyshnyky

The designer opens with this place’s coordinates, latitude 50.9° for the row spacing and the DBN loads of the nearest regional centre — Чернігів, 76 km: snow 1,720 Pa, wind 410 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

33Jan54Feb90Mar118Apr139May145Jun146Jul141Aug112Sep79Oct34Nov25Dec

July: 146 kWh/kWp, December: 25 — 5.8 times less.

March: 90 against 96 in the oblast, 6.3% less.

Tertyshnyky: plants, kWh
kWpA yearJulyDecember
55,568730125
1011,1351,460250
1516,7032,190375

Snow and wind: Чернігів

Example: a 10 kW ground frame

For the loads of Chernihiv: 11.16 kWp, 18 panels, 389 kg of steel, 12 piles, materials ≈ 52,358 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Nizhynskyi RaionChernihiv Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.