Solar plant: site data
Solar power plant in Tereshkivka, Nizhynskyi Raion, Chernihiv Oblast
Tereshkivka: 1,114 kWh per kWp a year, tilt 37° 2° east of south (PVGIS). 0.6% above the oblast median (1,108). #143 of 327 in the rayon, #513 of 1558 in the oblast.
Nizhyn, the rayon centre, is 38 km away. 130 m above sea level. 36 km away: Pryluky, the nearest bigger centre, the same 1,116. Snow and wind from the nearest regional centre in the DBN — Чернігів, 97 km. 12.78 m between rows, pitch 16.60 m (latitude 50.7°).
- Yield of 1 kWp
- 1,114kWh/year
- Tilt
- 37°2° east of south
- 10 kW
- 11,142kWh/year
- Row pitch
- 16.60m · GCR 0.29
- T_min
- -40 °Cregion I, north-western
- Snow S₀ / wind W₀
- 1,720 / 410Pa
Ground frame designer
A ground frame for a solar plant: Tereshkivka
The designer opens with this place’s coordinates, latitude 50.7° for the row spacing and the DBN loads of the nearest regional centre — Чернігів, 97 km: snow 1,720 Pa, wind 410 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 145 kWh/kWp, December: 25 — 5.8 times less.
March: 90 against 96 in the oblast, 6.3% less.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 5,571 | 725 | 125 |
| 10 | 11,142 | 1,450 | 250 |
| 15 | 16,713 | 2,175 | 375 |
Example: a 10 kW ground frame
For the loads of Chernihiv: 11.16 kWp, 18 panels, 389 kg of steel, 12 piles, materials ≈ 52,358 UAH.
How these numbers are computed
Nearby
- Borotba3 km1,125 kWh/kWp
- Dymyrivka3 km1,119 kWh/kWp
- Klenove3 km1,114 kWh/kWp
- Bekarshchyna4 km1,115 kWh/kWp
- Shniakivka4 km1,119 kWh/kWp
- Verbove4 km1,114 kWh/kWp
All places: Nizhynskyi RaionChernihiv Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.