Solar plant: site data

Solar power plant in Sulak, Nizhynskyi Raion, Chernihiv Oblast

Sulak: 1,116 kWh per kWp a year, tilt 37° 1° east of south (PVGIS). 0.8% above the oblast median (1,108). #111 of 327 in the rayon, #429 of 1558 in the oblast.

Nizhyn, the rayon centre, is 14 km away. 123 m above sea level. 14 km away: Nizhyn, the nearest bigger centre, 1,108 — 0.8% more here. Snow and wind from the nearest regional centre in the DBN — Чернігів, 66 km. 13.06 m between rows, pitch 16.88 m (latitude 51.0°).

Yield of 1 kWp
1,116kWh/year
Tilt
37°1° east of south
10 kW
11,163kWh/year
Row pitch
16.88m · GCR 0.28
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,720 / 410Pa

Ground frame designer

A ground frame for a solar plant: Sulak

The designer opens with this place’s coordinates, latitude 51.0° for the row spacing and the DBN loads of the nearest regional centre — Чернігів, 66 km: snow 1,720 Pa, wind 410 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

34Jan54Feb92Mar119Apr140May145Jun145Jul140Aug112Sep78Oct34Nov25Dec

June: 145 kWh/kWp, December: 25 — 5.8 times less.

February: 54 against 57 in the oblast, 5.3% less.

Sulak: plants, kWh
kWpA yearJuneDecember
55,582725125
1011,1631,450250
1516,7452,175375

Snow and wind: Чернігів

Example: a 10 kW ground frame

For the loads of Chernihiv: 11.16 kWp, 18 panels, 389 kg of steel, 12 piles, materials ≈ 52,358 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Nizhynskyi RaionChernihiv Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.