Solar plant: site data

Solar power plant in Starosillia, Chernihivskyi Raion, Chernihiv Oblast

Starosillia: 1,091 kWh per kWp a year, tilt 39° 2° east of south (PVGIS). 1.6% below the oblast median (1,108). #377 of 479 in the rayon, #1184 of 1558 in the oblast.

Chernihiv, the rayon centre, is 61 km away. 147 m above sea level. 51 km away: Koryukivka, the nearest bigger centre, 1,085 — 0.6% more here. Snow and wind from the nearest regional centre in the DBN — Чернігів, 63 km. 14.95 m between rows, pitch 18.67 m (latitude 52.0°).

Yield of 1 kWp
1,091kWh/year
Tilt
39°2° east of south
10 kW
10,905kWh/year
Row pitch
18.67m · GCR 0.26
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,720 / 410Pa

Ground frame designer

A ground frame for a solar plant: Starosillia

The designer opens with this place’s coordinates, latitude 52.0° for the row spacing and the DBN loads of the nearest regional centre — Чернігів, 63 km: snow 1,720 Pa, wind 410 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

35Jan58Feb98Mar116Apr138May142Jun139Jul135Aug107Sep71Oct28Nov23Dec

June: 142 kWh/kWp, December: 23 — 6.2 times less.

November: 28 against 33 in the oblast, 15.2% less.

Starosillia: plants, kWh
kWpA yearJuneDecember
55,453710115
1010,9051,420230
1516,3582,130345

Snow and wind: Чернігів

Example: a 10 kW ground frame

For the loads of Chernihiv: 11.16 kWp, 18 panels, 389 kg of steel, 12 piles, materials ≈ 52,358 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Chernihivskyi RaionChernihiv Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.