Solar power plant in Smychyn, Chernihivskyi Raion, Chernihiv Oblast
Smychyn: 1,093 kWh per kWp a year, tilt 38° 3° east of south (PVGIS). 1.4% below the oblast median (1,108). #356 of 479 in the rayon, #1131 of 1558 in the oblast.
Chernihiv, the rayon centre, is 35 km away. 129 m above sea level. 35 km away: Chernihiv, the nearest bigger centre, 1,105 — 1.1% less here. Snow and wind from the nearest regional centre in the DBN — Чернігів, 36 km. 14.28 m between rows, pitch 18.05 m (latitude 51.7°).
- Yield of 1 kWp
- 1,093kWh/year
- Tilt
- 38°3° east of south
- 10 kW
- 10,927kWh/year
- Row pitch
- 18.05m · GCR 0.27
- T_min
- -40 °Cregion I, north-western
- Snow S₀ / wind W₀
- 1,720 / 410Pa
Ground frame designer
A ground frame for a solar plant: Smychyn
The designer opens with this place’s coordinates, latitude 51.7° for the row spacing and the DBN loads of the nearest regional centre — Чернігів, 36 km: snow 1,720 Pa, wind 410 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
June: 142 kWh/kWp, December: 24 — 5.9 times less.
November: 30 against 33 in the oblast, 9.1% less.
| kWp | A year | June | December |
|---|---|---|---|
| 5 | 5,464 | 710 | 120 |
| 10 | 10,927 | 1,420 | 240 |
| 15 | 16,391 | 2,130 | 360 |
Example: a 10 kW ground frame
For the loads of Chernihiv: 11.16 kWp, 18 panels, 389 kg of steel, 12 piles, materials ≈ 52,358 UAH.
How these numbers are computed
Nearby
- Dibrivne2 km1,095 kWh/kWp
- Lashuky3 km1,093 kWh/kWp
- Konotop6 km1,092 kWh/kWp
- Velykyi Dyrchyn7 km1,092 kWh/kWp
- Makyshyn7 km1,096 kWh/kWp
- Pekurivka8 km1,096 kWh/kWp
All places: Chernihivskyi RaionChernihiv Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed