Solar plant: site data
Solar power plant in Shevchenkove, Nizhynskyi Raion, Chernihiv Oblast
Shevchenkove: 1,102 kWh per kWp a year, tilt 37° 1° east of south (PVGIS). 0.5% below the oblast median (1,108). #297 of 327 in the rayon, #973 of 1558 in the oblast.
Nizhyn, the rayon centre, is 68 km away. 144 m above sea level. 35 km away: Konotop, the nearest bigger centre, 1,110 — 0.7% less here. Snow and wind from the nearest regional centre in the DBN — Чернігів, 122 km. 13.10 m between rows, pitch 16.92 m (latitude 51.0°).
- Yield of 1 kWp
- 1,102kWh/year
- Tilt
- 37°1° east of south
- 10 kW
- 11,021kWh/year
- Row pitch
- 16.92m · GCR 0.28
- T_min
- -40 °Cregion I, north-western
- Snow S₀ / wind W₀
- 1,720 / 410Pa
Ground frame designer
A ground frame for a solar plant: Shevchenkove
The designer opens with this place’s coordinates, latitude 51.0° for the row spacing and the DBN loads of the nearest regional centre — Чернігів, 122 km: snow 1,720 Pa, wind 410 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
June: 144 kWh/kWp, December: 22 — 6.5 times less.
January: 32 against 35 in the oblast, 8.6% less.
| kWp | A year | June | December |
|---|---|---|---|
| 5 | 5,511 | 720 | 110 |
| 10 | 11,021 | 1,440 | 220 |
| 15 | 16,532 | 2,160 | 330 |
Example: a 10 kW ground frame
For the loads of Chernihiv: 11.16 kWp, 18 panels, 389 kg of steel, 12 piles, materials ≈ 52,358 UAH.
How these numbers are computed
Nearby
- Zalissia3 km1,104 kWh/kWp
- Vesele3 km1,104 kWh/kWp
- Hryhorivka4 km1,102 kWh/kWp
- Hayvoron5 km1,110 kWh/kWp
- Vyshnivske6 km1,106 kWh/kWp
- Bilovezhi Pershi6 km1,104 kWh/kWp
All places: Nizhynskyi RaionChernihiv Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.