Solar plant: site data

Solar power plant in Rozloty, Novhorod-Siverskyi Raion, Chernihiv Oblast

Rozloty: 1,096 kWh per kWp a year, tilt 38° 2° east of south (PVGIS). 1.0% below the oblast median (1,108). #55 of 247 in the rayon, #1075 of 1558 in the oblast.

Novhorod-Siverskyi, the rayon centre, is 34 km away. 128 m above sea level. 29 km away: Shostka, the nearest bigger centre, 1,082 — 1.4% more here. Snow and wind from the nearest regional centre in the DBN — Чернігів, 130 km. 14.23 m between rows, pitch 18.00 m (latitude 51.7°).

Yield of 1 kWp
1,096kWh/year
Tilt
38°2° east of south
10 kW
10,964kWh/year
Row pitch
18.00m · GCR 0.27
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,720 / 410Pa

Ground frame designer

A ground frame for a solar plant: Rozloty

The designer opens with this place’s coordinates, latitude 51.7° for the row spacing and the DBN loads of the nearest regional centre — Чернігів, 130 km: snow 1,720 Pa, wind 410 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

33Jan60Feb97Mar115Apr139May142Jun139Jul136Aug107Sep72Oct33Nov23Dec

June: 142 kWh/kWp, December: 23 — 6.2 times less.

January: 33 against 35 in the oblast, 5.7% less.

Rozloty: plants, kWh
kWpA yearJuneDecember
55,482710115
1010,9641,420230
1516,4462,130345

Snow and wind: Чернігів

Example: a 10 kW ground frame

For the loads of Chernihiv: 11.16 kWp, 18 panels, 389 kg of steel, 12 piles, materials ≈ 52,358 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Novhorod-Siverskyi RaionChernihiv Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.