Solar plant: site data

Solar power plant in Pyrohivtsi, Prylutskyi Raion, Chernihiv Oblast

Pyrohivtsi: 1,117 kWh per kWp a year, tilt 37° 2° east of south (PVGIS). 0.9% above the oblast median (1,108). #203 of 285 in the rayon, #395 of 1558 in the oblast.

Pryluky, the rayon centre, is 3 km away. 126 m above sea level. 3 km away: Pryluky, the nearest bigger centre, the same 1,116. Snow and wind from the nearest regional centre in the DBN — Чернігів, 123 km. 12.69 m between rows, pitch 16.51 m (latitude 50.6°).

Yield of 1 kWp
1,117kWh/year
Tilt
37°2° east of south
10 kW
11,174kWh/year
Row pitch
16.51m · GCR 0.29
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,720 / 410Pa

Ground frame designer

A ground frame for a solar plant: Pyrohivtsi

The designer opens with this place’s coordinates, latitude 50.6° for the row spacing and the DBN loads of the nearest regional centre — Чернігів, 123 km: snow 1,720 Pa, wind 410 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

35Jan57Feb93Mar117Apr140May142Jun144Jul141Aug111Sep78Oct35Nov24Dec

July: 144 kWh/kWp, December: 24 — 6.0 times less.

November: 35 against 33 in the oblast, 6.1% more.

Pyrohivtsi: plants, kWh
kWpA yearJulyDecember
55,587720120
1011,1741,440240
1516,7612,160360

Snow and wind: Чернігів

Example: a 10 kW ground frame

For the loads of Chernihiv: 11.16 kWp, 18 panels, 389 kg of steel, 12 piles, materials ≈ 52,358 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Prylutskyi RaionChernihiv Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.