Solar plant: site data

Solar power plant in Politrudnia, Chernihivskyi Raion, Chernihiv Oblast

Politrudnia: 1,094 kWh per kWp a year, tilt 38° 2° east of south (PVGIS). 1.3% below the oblast median (1,108). #348 of 479 in the rayon, #1116 of 1558 in the oblast.

Chernihiv, the rayon centre, is 42 km away. 125 m above sea level. 42 km away: Chernihiv, the nearest bigger centre, 1,105 — 1.0% less here. Snow and wind from the nearest regional centre in the DBN — Чернігів, 44 km. 14.39 m between rows, pitch 18.16 m (latitude 51.8°).

Yield of 1 kWp
1,094kWh/year
Tilt
38°2° east of south
10 kW
10,940kWh/year
Row pitch
18.16m · GCR 0.26
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,720 / 410Pa

Ground frame designer

A ground frame for a solar plant: Politrudnia

The designer opens with this place’s coordinates, latitude 51.8° for the row spacing and the DBN loads of the nearest regional centre — Чернігів, 44 km: snow 1,720 Pa, wind 410 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

33Jan59Feb98Mar117Apr139May142Jun139Jul135Aug108Sep72Oct29Nov23Dec

June: 142 kWh/kWp, December: 23 — 6.2 times less.

November: 29 against 33 in the oblast, 12.1% less.

Politrudnia: plants, kWh
kWpA yearJuneDecember
55,470710115
1010,9401,420230
1516,4102,130345

Snow and wind: Чернігів

Example: a 10 kW ground frame

For the loads of Chernihiv: 11.16 kWp, 18 panels, 389 kg of steel, 12 piles, materials ≈ 52,358 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Chernihivskyi RaionChernihiv Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.