Solar plant: site data

Solar power plant in Pohrebets, Nizhynskyi Raion, Chernihiv Oblast

Pohrebets: 1,117 kWh per kWp a year, tilt 38° 4° east of south (PVGIS). 0.8% above the oblast median (1,108). #108 of 327 in the rayon, #419 of 1558 in the oblast.

Nizhyn, the rayon centre, is 18 km away. 127 m above sea level. 18 km away: Nizhyn, the nearest bigger centre, 1,108 — 0.8% more here. Snow and wind from the nearest regional centre in the DBN — Чернігів, 81 km. 13.27 m between rows, pitch 17.04 m (latitude 50.9°).

Yield of 1 kWp
1,117kWh/year
Tilt
38°4° east of south
10 kW
11,166kWh/year
Row pitch
17.04m · GCR 0.28
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,720 / 410Pa

Ground frame designer

A ground frame for a solar plant: Pohrebets

The designer opens with this place’s coordinates, latitude 50.9° for the row spacing and the DBN loads of the nearest regional centre — Чернігів, 81 km: snow 1,720 Pa, wind 410 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

33Jan54Feb95Mar118Apr140May145Jun145Jul140Aug111Sep78Oct34Nov25Dec

June: 145 kWh/kWp, December: 25 — 5.8 times less.

January: 33 against 35 in the oblast, 5.7% less.

Pohrebets: plants, kWh
kWpA yearJuneDecember
55,583725125
1011,1661,450250
1516,7492,175375

Snow and wind: Чернігів

Example: a 10 kW ground frame

For the loads of Chernihiv: 11.16 kWp, 18 panels, 389 kg of steel, 12 piles, materials ≈ 52,358 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Nizhynskyi RaionChernihiv Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.