Solar power plant in Pisky, Nizhynskyi Raion, Chernihiv Oblast

Pisky: 1,101 kWh per kWp a year, tilt 37° 1° east of south (PVGIS). 0.6% below the oblast median (1,108). #312 of 327 in the rayon, #1008 of 1558 in the oblast.

Nizhyn, the rayon centre, is 55 km away. 142 m above sea level. 38 km away: Konotop, the nearest bigger centre, 1,110 — 0.8% less here. Snow and wind from the nearest regional centre in the DBN — Чернігів, 103 km. 13.26 m between rows, pitch 17.08 m (latitude 51.1°).

Yield of 1 kWp
1,101kWh/year
Tilt
37°1° east of south
10 kW
11,011kWh/year
Row pitch
17.08m · GCR 0.28
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,720 / 410Pa

Ground frame designer

A ground frame for a solar plant: Pisky

The designer opens with this place’s coordinates, latitude 51.1° for the row spacing and the DBN loads of the nearest regional centre — Чернігів, 103 km: snow 1,720 Pa, wind 410 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

33Jan56Feb89Mar116Apr141May143Jun143Jul140Aug110Sep75Oct33Nov23Dec

June: 143 kWh/kWp, December: 23 — 6.2 times less.

March: 89 against 96 in the oblast, 7.3% less.

Pisky: plants, kWh
kWpA yearJuneDecember
55,506715115
1011,0111,430230
1516,5172,145345

Snow and wind: Чернігів

Example: a 10 kW ground frame

For the loads of Chernihiv: 11.16 kWp, 18 panels, 389 kg of steel, 12 piles, materials ≈ 52,358 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed