Solar plant: site data

Solar power plant in Petryky, Chernihivskyi Raion, Chernihiv Oblast

Petryky: 1,111 kWh per kWp a year, tilt 38° 2° east of south (PVGIS). Exactly the oblast median (1,108). #168 of 479 in the rayon, #632 of 1558 in the oblast.

Chernihiv, the rayon centre, is 40 km away. 154 m above sea level. 40 km away: Chernihiv, the nearest bigger centre, 1,105 — 0.5% more here. Snow and wind from the nearest regional centre in the DBN — Чернігів, 41 km. 14.25 m between rows, pitch 18.02 m (latitude 51.7°).

Yield of 1 kWp
1,111kWh/year
Tilt
38°2° east of south
10 kW
11,112kWh/year
Row pitch
18.02m · GCR 0.27
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,720 / 410Pa

Ground frame designer

A ground frame for a solar plant: Petryky

The designer opens with this place’s coordinates, latitude 51.7° for the row spacing and the DBN loads of the nearest regional centre — Чернігів, 41 km: snow 1,720 Pa, wind 410 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

33Jan58Feb100Mar120Apr139May143Jun142Jul136Aug110Sep76Oct32Nov23Dec

June: 143 kWh/kWp, December: 23 — 6.2 times less.

January: 33 against 35 in the oblast, 5.7% less.

Petryky: plants, kWh
kWpA yearJuneDecember
55,556715115
1011,1121,430230
1516,6682,145345

Snow and wind: Чернігів

Example: a 10 kW ground frame

For the loads of Chernihiv: 11.16 kWp, 18 panels, 389 kg of steel, 12 piles, materials ≈ 52,358 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Chernihivskyi RaionChernihiv Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.