Solar plant: site data
Solar power plant in Pesotske, Chernihivskyi Raion, Chernihiv Oblast
Pesotske: 1,127 kWh per kWp a year, tilt 38° 2° east of south (PVGIS). 1.8% above the oblast median (1,108). #44 of 479 in the rayon, #57 of 1558 in the oblast.
Chernihiv, the rayon centre, is 54 km away. 113 m above sea level. 51 km away: Nizhyn, the nearest bigger centre, 1,108 — 1.8% more here. Snow and wind from the nearest regional centre in the DBN — Чернігів, 52 km. 13.43 m between rows, pitch 17.20 m (latitude 51.0°).
- Yield of 1 kWp
- 1,127kWh/year
- Tilt
- 38°2° east of south
- 10 kW
- 11,274kWh/year
- Row pitch
- 17.20m · GCR 0.28
- T_min
- -40 °Cregion I, north-western
- Snow S₀ / wind W₀
- 1,720 / 410Pa
Ground frame designer
A ground frame for a solar plant: Pesotske
The designer opens with this place’s coordinates, latitude 51.0° for the row spacing and the DBN loads of the nearest regional centre — Чернігів, 52 km: snow 1,720 Pa, wind 410 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
June: 146 kWh/kWp, December: 26 — 5.6 times less.
December: 26 against 24 in the oblast, 8.3% more.
| kWp | A year | June | December |
|---|---|---|---|
| 5 | 5,637 | 730 | 130 |
| 10 | 11,274 | 1,460 | 260 |
| 15 | 16,911 | 2,190 | 390 |
Example: a 10 kW ground frame
For the loads of Chernihiv: 11.16 kWp, 18 panels, 389 kg of steel, 12 piles, materials ≈ 52,358 UAH.
How these numbers are computed
Nearby
- Shuliaky3 km1,122 kWh/kWp
- Hladke3 km1,130 kWh/kWp
- Kipti3 km1,124 kWh/kWp
- Lemeshi4 km1,127 kWh/kWp
- Shaloiky4 km1,127 kWh/kWp
- Horbachi5 km1,122 kWh/kWp
All places: Chernihivskyi RaionChernihiv Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.