Solar plant: site data

Solar power plant in Pererost, Chernihivskyi Raion, Chernihiv Oblast

Pererost: 1,068 kWh per kWp a year, tilt 38° 2° east of south (PVGIS). 3.6% below the oblast median (1,108). #462 of 479 in the rayon, #1527 of 1558 in the oblast.

Chernihiv, the rayon centre, is 42 km away. 150 m above sea level. 42 km away: Chernihiv, the nearest bigger centre, 1,105 — 3.3% less here. Snow and wind from the nearest regional centre in the DBN — Чернігів, 44 km. 14.45 m between rows, pitch 18.22 m (latitude 51.9°).

Yield of 1 kWp
1,068kWh/year
Tilt
38°2° east of south
10 kW
10,684kWh/year
Row pitch
18.22m · GCR 0.26
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,720 / 410Pa

Ground frame designer

A ground frame for a solar plant: Pererost

The designer opens with this place’s coordinates, latitude 51.9° for the row spacing and the DBN loads of the nearest regional centre — Чернігів, 44 km: snow 1,720 Pa, wind 410 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

35Jan54Feb93Mar114Apr134May139Jun137Jul133Aug107Sep71Oct29Nov23Dec

June: 139 kWh/kWp, December: 23 — 6.0 times less.

November: 29 against 33 in the oblast, 12.1% less.

Pererost: plants, kWh
kWpA yearJuneDecember
55,342695115
1010,6841,390230
1516,0262,085345

Snow and wind: Чернігів

Example: a 10 kW ground frame

For the loads of Chernihiv: 11.16 kWp, 18 panels, 389 kg of steel, 12 piles, materials ≈ 52,358 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Chernihivskyi RaionChernihiv Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.