Solar plant: site data

Solar power plant in Nykonivka, Prylutskyi Raion, Chernihiv Oblast

Nykonivka: 1,127 kWh per kWp a year, tilt 38° 2° east of south (PVGIS). 1.7% above the oblast median (1,108). #14 of 285 in the rayon, #62 of 1558 in the oblast.

Pryluky, the rayon centre, is 40 km away. 160 m above sea level. 40 km away: Pryluky, the nearest bigger centre, 1,116 — 1.0% more here. Snow and wind from the nearest regional centre in the DBN — Суми, 134 km. 13.09 m between rows, pitch 16.86 m (latitude 50.7°).

Yield of 1 kWp
1,127kWh/year
Tilt
38°2° east of south
10 kW
11,271kWh/year
Row pitch
16.86m · GCR 0.28
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,670 / 420Pa

Ground frame designer

A ground frame for a solar plant: Nykonivka

The designer opens with this place’s coordinates, latitude 50.7° for the row spacing and the DBN loads of the nearest regional centre — Суми, 134 km: snow 1,670 Pa, wind 420 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

39Jan58Feb96Mar117Apr139May143Jun144Jul141Aug111Sep78Oct36Nov24Dec

July: 144 kWh/kWp, December: 24 — 6.0 times less.

January: 39 against 35 in the oblast, 11.4% more.

Nykonivka: plants, kWh
kWpA yearJulyDecember
55,636720120
1011,2711,440240
1516,9072,160360

Snow and wind: Суми

Example: a 10 kW ground frame

For the loads of Sumy: 11.16 kWp, 18 panels, 385 kg of steel, 12 piles, materials ≈ 51,876 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Prylutskyi RaionChernihiv Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.