Solar power plant in Novyi Podil, Prylutskyi Raion, Chernihiv Oblast
Novyi Podil: 1,119 kWh per kWp a year, tilt 38° 2° east of south (PVGIS). 1.0% above the oblast median (1,108). #163 of 285 in the rayon, #317 of 1558 in the oblast.
Pryluky, the rayon centre, is 45 km away. 134 m above sea level. 37 km away: Nizhyn, the nearest bigger centre, 1,108 — 1.0% more here. Snow and wind from the nearest regional centre in the DBN — Чернігів, 95 km. 13.39 m between rows, pitch 17.16 m (latitude 51.0°).
- Yield of 1 kWp
- 1,119kWh/year
- Tilt
- 38°2° east of south
- 10 kW
- 11,191kWh/year
- Row pitch
- 17.16m · GCR 0.28
- T_min
- -40 °Cregion I, north-western
- Snow S₀ / wind W₀
- 1,720 / 410Pa
Ground frame designer
A ground frame for a solar plant: Novyi Podil
The designer opens with this place’s coordinates, latitude 51.0° for the row spacing and the DBN loads of the nearest regional centre — Чернігів, 95 km: snow 1,720 Pa, wind 410 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 143 kWh/kWp, December: 24 — 6.0 times less.
February: 59 against 57 in the oblast, 3.5% more.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 5,596 | 715 | 120 |
| 10 | 11,191 | 1,430 | 240 |
| 15 | 16,787 | 2,145 | 360 |
Example: a 10 kW ground frame
For the loads of Chernihiv: 11.16 kWp, 18 panels, 389 kg of steel, 12 piles, materials ≈ 52,358 UAH.
How these numbers are computed
Nearby
- Krupychpole4 km1,119 kWh/kWp
- Ivanhorod5 km1,118 kWh/kWp
- Svarychivka7 km1,119 kWh/kWp
- Dovbni7 km1,113 kWh/kWp
- Makhnivka7 km1,120 kWh/kWp
- Maksymivka8 km1,114 kWh/kWp
All places: Prylutskyi RaionChernihiv Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.